Free bathroom remodel estimate template

A bathroom remodel estimate line by line: demolition, the plumbing and electrical, waterproofing and tile, the shower or tub, vanity and fixtures as allowances, the permit and a contingency.

Bathroom remodel estimate template: a sample filled in with example lines for the trade
The bathroom remodel estimate template, with example lines to replace.
Fill it in online, free

Opens in the estimate maker with these lines filled in. Adds up the totals, downloads a PDF. No sign-up.

Download PDF Print or fill in by hand Download Word (.docx) Also opens in Google Docs Download Excel (.xlsx) Also opens in Google Sheets

What’s on the bathroom remodel estimate template

Extra fields on this template: Job site.

ItemQtyRateAmount
Demolition and disposalFull gut, 5 × 9 ft1$1,500.00$1,500.00
Plumbing, relocate drainLicensed plumber1$2,400.00$2,400.00
Walk-in showerWaterproofing, pan, glass door1$4,800.00$4,800.00
Floor and wall tileAllowance $7/sq ft material1$3,600.00$3,600.00
Vanity, toilet and fixturesAllowance1$2,200.00$2,200.00
Permit and contingency, 10%1$1,600.00$1,600.00
Estimated total$16,100.00

Example prices in US dollars. Replace them with your own; in the generator, any currency works.

What drives a bathroom remodel estimate

  • Layout changes: moving a toilet or drain costs far more than replacing in place.
  • Tub to walk-in shower: waterproofing, a new pan and glass add up.
  • Tile: price per square foot of material plus installation; large-format and patterns take longer.
  • Allowances for vanity, toilet, faucets and lighting until the client chooses.
  • Hidden damage: rot and leaks under old floors are common. Price repairs separately.

For kitchens, see the kitchen remodel estimate template.

Frequently asked questions

How much contingency for a bathroom?

10% is common, more in older homes with original plumbing.

Does a bathroom remodel need a permit?

Usually, if plumbing, electrical or walls change. Check with your local building department.

How long does a bathroom remodel take?

Often two to four weeks for a full gut, depending on inspections and tile work.